The new project has a total of three phases with about 355 apartment units and each phase consisting of constructing a new, four-story, wood frame building at the site. The new facilities also include a senior services center that will provide amenities such as a cafe, technology lab, beauty salon, meeting rooms and office space.
The Phase 1 building was competed in 2016 and included 101-apartment units and was built on grounds formerly occupied by an old bowling alley. Phase 2 construction was completed in 2019, required demolition of a previous apartment building, and included 102-apartment units. Phase 3 construction is scheduled at a future date.
Shannon & Wilson provided geotechnical services for Phases 1 and 2 with our scope of services including subsurface explorations; laboratory testing; analysis and design recommendations for building foundations, retaining walls, pavements, and slopes; construction observation and testing during site preparation; and special inspections during building construction. Special inspections included observation of shallow foundation excavations, rebar inspections, concrete testing, bolt and weld inspections, and inspection of fire proofing.
Thomas Abkemeier
Vice President, Saint Louis Office Manager
Craig Brooks
Laboratory Manager
Dale Miller
Engineer
Mark Wieners
Senior Geologist
James Zschau
Senior Geologist